• Home
  • India
  • ISRO conducts flight acceptance hot test of Cryogenic Engine for LVM3-M6 Mission

ISRO conducts flight acceptance hot test of Cryogenic Engine for LVM3-M6 Mission

ISRO conducts flight acceptance hot test of Cryogenic Engine for LVM3-M6 Mission

0:00

The Launch Vehicle Mark-3 is a three-stage medium-lift launch vehicle developed by the Indian Space Research Organisation. File
| Photo Credit: Reuters

The Indian Space Research Organisation (ISRO) on Saturday (March 15, 2025) said it has successfully conducted the flight acceptance hot testing of the cryogenic engine identified for the sixth operational mission of LVM3 launch vehicle (LVM-M6) at ISRO Propulsion Complex, Mahendragiri in Tamil Nadu.

The LVM3 (Launch Vehicle Mark-3) is a three-stage medium-lift launch vehicle developed by the Indian Space Research Organisation (ISRO).

The cryogenic engine of every mission undergoes hot testing as part of its acceptance process for the flight, ISRO said in a statement.

Hot tests for the indigenous cryogenic engine (CE20) used in the Cryogenic Upper Stage of LVM3 were so far performed at the High-Altitude Test (HAT) facility at ISRO Propulsion Complex (IPRC) where vacuum conditions are simulated with complex installations, limiting the maximum hot test duration to 25 seconds.

“In the current test, the engine was tested for a longer duration of 100 seconds for the first time using an innovative Nozzle Protection System under non-vacuum conditions,” ISRO said.

The space agency said that this test method significantly reduces the setup time and effort required for the flight acceptance test of a cryogenic engine, which in turn helps faster delivery of cryogenic stages for space missions.

“Performance of the CE20 engine met all the test objectives and the parameters were closely matching with the predictions during the entire duration of the test,” ISRO said.

Further, this engine will be integrated into the Cryogenic Upper Stage of the launch vehicle for the LVM3-M6 mission, which is scheduled during the second half of 2025, the statement read.

Releated Posts

State records attendance percentage of 98.27 on first day of SSC exam

0:00 SSC students taking the blessings of their classteacher before entering the examination centre, at KDPM high school,…

ByByAmlanMar 17, 2025

VMRDA to spend ₹390 crore to improve connectivity to Bhogapuram airport from Visakhapatnam

0:00 The NH-16 stretch connecting Visakhapatnam and Bhogapuram. The construction of the greenfield international airport in Bhogapuram is…

ByByAmlanMar 17, 2025

Ayodhya Ram temple will have no chief priest as of now, says Champat Rai

0:00 Shri Ram Janmabhoomi temple. File | Photo Credit: ANI The Ayodhya Ram temple will not have any…

ByByAmlanMar 17, 2025

Haryana budget: CM sets aside ₹2,100 monthly aid for women, announces Unified Pension Scheme for State govt. workers

0:00 Haryana Chief Minister Nayab Singh Saini in the Assembly on Monday. | Photo Credit: PTI Haryana Chief Minister…

ByByAmlanMar 17, 2025